MOBILE - 2.5m x 2.5m x 5m HIGH - 1 LOB
GENERIC DESIGN BINDER TERMS AND CONDITIONS
It is the client’s responsibility to ensure:
-That scaffolds are erected according to all SANS 10085:2004.
-That the design, dimensions, quantities and applied loads are in accordance with his requirements.
-That all foundations and ground conditions are capable of safely supporting the imposed leg loads for all
design conditions.
-The provision of suitable temporary access platforms for the erection and dismantling of the equipment shown on this drawing. The contractor shall ensure that all relevant safety regulations are followed at all stages during the use of the equipment.
-That all scaffolding is adequately tied to an element of the permanent works capable of resisting the applied lateral loads. If this is not possible, the contractor shall supply suitable bracing to ensure the stability of the temporary works at all phases of erection, use or dismantling.
-Quik Scaffolding Design will not accept responsibility for any alterations made to the design.